2930 61st Street
Menomonie, WI 54751
715-283-4422

Our Top Cities


Local Reviews
for golden valley, mn


Job Locations
for golden valley, mn

Chase O.

Chase O. Job Checkin

Installed new tanked water heater as specified in estimate, requiring multiple return visits to complete installation. Connected unit to existing gas and water lines, ensuring proper sealing at connection points. Final inspection confirmed proper operation with no leaks.

Installed new tanked water heater as specified in estimate, requiring multiple return visits to complete installation. Connected unit to existing gas and water lines, ensuring proper sealing at connection points. Final inspection confirmed proper operation with no leaks. Installed new tanked water heater as specified in estimate, requiring multiple return visits to complete installation. Connected unit to existing gas and water lines, ensuring proper sealing at connection points. Final inspection confirmed proper operation with no leaks.

Charles P.

Charles P. Job Checkin

Responded to service call for Richmond water heater with pilot light outage resulting in no hot water. Diagnosed issue with pilot assembly, relit pilot light and verified proper operation. Provided customer with both repair and replacement options for their aging tank-style water heater, noting the Lennox heating system in proximity was functioning normally.

Responded to service call for Richmond water heater with pilot light outage resulting in no hot water. Diagnosed issue with pilot assembly, relit pilot light and verified proper operation. Provided customer with both repair and replacement options for their aging tank-style water heater, noting the Lennox heating system in proximity was functioning normally. Responded to service call for Richmond water heater with pilot light outage resulting in no hot water. Diagnosed issue with pilot assembly, relit pilot light and verified proper operation. Provided customer with both repair and replacement options for their aging tank-style water heater, noting the Lennox heating system in proximity was functioning normally.

Robert J.

Robert J. Job Checkin

Successfully installed two new customer-furnished lavatory faucets with brushed nickel finish. Identified lower level hot side shut-off valve that is stuck and requires replacement. Will return to complete this additional repair once customer coordinates water shut-off to the unit, as main water valve is located in another unit.

Successfully installed two new customer-furnished lavatory faucets with brushed nickel finish. Identified lower level hot side shut-off valve that is stuck and requires replacement. Will return to complete this additional repair once customer coordinates water shut-off to the unit, as main water valve is located in another unit. Successfully installed two new customer-furnished lavatory faucets with brushed nickel finish. Identified lower level hot side shut-off valve that is stuck and requires replacement. Will return to complete this additional repair once customer coordinates water shut-off to the unit, as main water valve is located in another unit.

Robert J.

Robert J. Job Checkin

Diagnosed and identified water leak originating from the pop-up assembly underneath bathroom sink. Inspection revealed aging faucets in both downstairs and upstairs lavatory with operational issues in the upstairs drain assembly. Recommended and scheduled replacement of both lavatory faucets, with installation to be completed on Thursday.

Diagnosed and identified water leak originating from the pop-up assembly underneath bathroom sink. Inspection revealed aging faucets in both downstairs and upstairs lavatory with operational issues in the upstairs drain assembly. Recommended and scheduled replacement of both lavatory faucets, with installation to be completed on Thursday. Diagnosed and identified water leak originating from the pop-up assembly underneath bathroom sink. Inspection revealed aging faucets in both downstairs and upstairs lavatory with operational issues in the upstairs drain assembly. Recommended and scheduled replacement of both lavatory faucets, with installation to be completed on Thursday.